Solar Awareness
Knowledge Base

Solar Awareness.

Everything you need to know before making an informed decision about solar energy.

Benefits

Why Solar?

Transform your energy consumption with sustainable solar power.

Reduce Electricity Bills

Save 70-90% on monthly electricity costs with solar power

Energy Independence

Protect yourself from rising electricity tariffs and grid outages

Environmental Impact

Reduce carbon footprint by 3-5 tons annually per kW installed

Government Subsidies

Avail up to 40% subsidy under PM Surya Ghar Yojana

Property Value

Increase property value by 3-4% with solar installation

Long-term Investment

25-year warranty with payback period of 4-6 years

Essential Guide

Pre-Purchase Checklist.

Ensure you make an informed decision. Review these critical factors before investing in solar energy.

Site Assessment

  • Roof orientation and tilt angle analysis
  • Shadow analysis throughout the day
  • Structural integrity of your roof
  • Available roof space measurement
  • Accessibility for installation and maintenance

System Specifications

  • Panel efficiency rating (minimum 20% recommended)
  • Tier-1 module certification (BIS, IEC)
  • Inverter capacity matching your load
  • Warranty terms (25+ years for panels)
  • Performance ratio guarantee (PR > 80%)

Financial Planning

  • Total system cost breakdown
  • Government subsidy eligibility (PM Surya Ghar)
  • Net metering approval process
  • ROI calculation (typically 4-6 years)
  • Financing options and EMI plans

Legal & Documentation

  • Net metering agreement with DISCOM
  • Subsidy application documentation
  • Installation permits and approvals
  • Insurance coverage for the system
  • Maintenance contract terms

Installation & Service

  • Installation timeline (typically 7-15 days)
  • Post-installation testing and commissioning
  • Training on monitoring system
  • Maintenance schedule and support
  • Emergency contact and service response time

Quality Assurance

  • Installation company credentials and experience
  • Previous project references
  • Certifications (NABCP, MNRE approved)
  • Material quality certificates
  • After-sales service reputation
Avoid These

Common Mistakes.

Learn from others' experiences to make the right choice.

Choosing the cheapest option

Impact

Low-quality panels degrade faster, reducing ROI

Solution

Invest in Tier-1 modules with proven track record

Ignoring roof condition

Impact

Structural issues can delay installation or cause damage

Solution

Conduct thorough roof inspection before purchase

Oversizing or undersizing the system

Impact

Wasted investment or insufficient power generation

Solution

Use professional load analysis and future expansion planning

Not verifying installer credentials

Impact

Poor installation leads to safety hazards and low efficiency

Solution

Check NABCP certification and customer reviews

Skipping net metering setup

Impact

Missing opportunity to sell excess power back to grid

Solution

Complete net metering application before installation

Neglecting maintenance planning

Impact

Dust and debris reduce efficiency by 15-20% annually

Solution

Schedule regular cleaning and annual maintenance checks

Key Points

Important Considerations.

Timeline Expectations

  • 01

    Site Survey & Design (3-5 days)

    Comprehensive assessment and system design

  • 02

    Approvals & Subsidy (15-30 days)

    Net metering and government subsidy processing

  • 03

    Installation (7-15 days)

    Physical installation and commissioning

Cost Breakdown

Solar Panels50-60%
Inverter15-20%
Mounting & Installation15-20%
Wiring & Accessories5-10%
After Subsidy (40%)60% of Total

System Sizing Guide

1 kW System

Generates ~4-5 units/day

Ideal for: Small homes (1-2 BHK) with monthly consumption of 200-300 units

3 kW System

Generates ~12-15 units/day

Ideal for: Medium homes (2-3 BHK) with monthly consumption of 500-800 units

5 kW System

Generates ~20-25 units/day

Ideal for: Large homes (3-4 BHK) with monthly consumption of 800-1200 units

Warranty Essentials

  • Panel Warranty

    25 years performance guarantee (80% efficiency minimum)

  • Inverter Warranty

    5-10 years (extendable) with service support

  • Installation Warranty

    2-5 years on workmanship and structural integrity

Ready to Get Started?

Get a free consultation and site assessment. Our experts will guide you through every step.